[1]
2026. Techno-economic assessment of a low-frequency AC transmission interconnection for an offshore wind farm in Colombia. Transactions on Energy Systems and Engineering Applications. 7, 1 (Jun. 2026), 1–32. DOI:https://doi.org/10.32397/tesea.vol7.n1.970.